The entire primary members and secondary members are designed and fully fabricated including cut-to-length, punching, drilling, welding and performing in the factory before being shipped to the site for erection. At the site, all components are assembled and jointed via nut & bolt connections; thereby reducing the costs and assembly times. These buildings can be provided with different structural and non-structural additions such as wall lights, turbo vents, roof monitors, ridge ventilators, doors & windows, trusses, mezzanine floors, canopies, crane systems, insulation, based on the customer’s requirements:
- Cost Savings: The price per square meter can be 25% lower than conventional steel buildings. Site erection cost is low because of faster erection times and easier erection process.
- Quality Control: Designed and fabricated in-house with strict quality control. The fabrication process is controlled from start to finish, including design and engineering, as well as detailing and manufacturing at the factory.
- . Quick Erection: All steel components are fabricated at the factory and are linked by bolts at the site. So, the erection process is fast, step by step, easy to install and requires simple equipment.
- Flexibility: Pre-engineered steel buildings are flexible in any requirement of design, easy to expand in the future and also economically with low transportation costs.
- Energy Efficiency: Nowadays, pre-engineered buildings are the green solution for the environment with CO2 reduction, energy efficiency and recyclability.